Home > Purchasing Guide

   Purchasing Guide

Purchasing Guide

1) Permanent magnetic component is not a  standard  mechanical component , but a functional component. It is generally produced as per the customer's demand. So a certain process period is involved. The lead time is about 10-15 days.

2) In order to meet the urgent need, we keep the following rough semi-finished products in stock. You may choose among them according to your design requirement to save the production time.

Size(mm) Material Properties Quantity(pcs) Weight(kg)
62กม41กม27.5 XGS208/160 200 150
62กม38กม30 XGS208/160 50 30
Note:The magnetization direction is along the dimension in boldface,
example 27.5,30.

3)The maximum dimension of the magnet is 60mm,the maximum dimension in magnetization direction is 200mm;the minimum dimension of the magnet is 2mm. For small size, the waste during production is more, so the cost per unit weight is high.  Preferential size of the produc:

4) The products will be tested strictly as per relevant standard. Unless specified by the user, the discrepancy of the properties of the product is below 5%.For quality problem found by the user, please give reasons and return the products to us.

6) Shipment method: 1. express air mail, transit time 2~4days,2.EMS,transit time3~7days.3express transportation by train,transit time5~10days 4.normal mail service 5.>Normal transportation by train. The specific shipment method is decided by the order quantity and the price.